VACANT LAND IN COUNTRY CLUB This lovely stand situated in a great area of Country Club Langebaan is a must have. With its quiet and safe entrance that leads you into a circle where little traffic and other disturbing noise is ruled out. The stand is large and will easily accommodate a large family home with ample space for out door living and recreation purposes.
DEVELOPMENT OPPORTUNITY IN OLYMPUS, PRETORIA EXCLUSIVE MANDATE GENERAL: PCP (Proof of Compliance Package) Process explanation (Set of Conditions before Promulgation): Once the reports from all departments within the council are received and deemed to be positive, including any tribunal hearing report, the PCP process (2-3 months) can start: 1. Bulk Contributions become payable. As well as any service upgrades if applicable. 2. Once paid and constructed, a certificate is received as confirmation. 3. Proclamation notice is published in Government Gazette. 4. Proclamation (3 weeks after notice is placed). 5. Zoning Certificate is obtained 14 days later. 6. Architect submit final SDP and designs for approval (1-3 months). 7. Construction to start. Objection from Friends of Faerie Glen currently delaying the Approval. Primary aim is to prevent going to a Tribunal. Additional Environmental Consultants (as generally accepted by the Objectors) was appointed on 4 June and the site assessment will be conducted within a week of the appointment date. The Environmental Report is then expected within 10 days thereafter. The Town Planner will then approach the Objectors with the additional Environmental Report to sway the Objectors to withdraw their objection. The Approval Letter will follow as soon as the objection is withdrawn. PCP process can then start. Tribunal date to be set if unsuccessful with the above mentioned. PROJECT SUMMARY: 25 Units @ 194m / unit (3 bed, 2.5 bathroom, open plan, double garage). Sectional title. Total unit squares: 4850m. Individual stand size: 284m Stand size: 10,000m.
DEVELOPMENT OPPORTUNITY IN OLYMPUS, PRETORIA EXCLUSIVE MANDATE GENERAL: PCP (Proof of Compliance Package) Process explanation (Set of Conditions before Promulgation): Once the reports from all departments within the council are received and deemed to be “positive”, including any tribunal hearing report, the PCP process (2-3 months) can start: 1. Bulk Contributions become payable. As well as any service upgrades if applicable. 2. Once paid and constructed, a certificate is received as confirmation. 3. Proclamation notice is published in Government Gazette. 4. Proclamation (3 weeks after notice is placed). 5. Zoning Certificate is obtained 14 days later. 6. Architect submit final SDP and designs for approval (1-3 months). 7. Construction to start. • Objection from Friends of Faerie Glen currently delaying the Approval. • Primary aim is to prevent going to a Tribunal. Additional Environmental Consultants (as generally accepted by the Objectors) was appointed on 4 June and the site assessment will be conducted within a week of the appointment date. The Environmental Report is then expected within 10 days thereafter. • The Town Planner will then approach the Objectors with the additional Environmental Report to sway the Objectors to withdraw their objection. • The Approval Letter will follow as soon as the objection is withdrawn. • PCP process can then start. • Tribunal date to be set if unsuccessful with the above mentioned. PROJECT SUMMARY: • 25 Units @ ± 194m² / unit (3 bed, 2.5 bathroom, open plan, double garage). Sectional title. • Total unit squares: 4850m². • Individual stand size: ± 284m² • Stand size: 10,000m².
DEVELOPMENT OPPORTUNITY IN OLYMPUS Executive summary: Location: Prime development area just off Atterbury Road. The 2 sites are bordered by proclaimed and developed townships Size: Portion 1= 1.0079 Ha and Portion 2 = 1.1049 Ha (Can be sold separately at R6 950 000 each) Current Zoning: Undetermined (agriculture use) Proposed Zoning: Res 4. Application to Establish a Township has already been submitted, based on the following: Density: 80 units/ha Coverage: 65% Height: 3 x Storey Status: • Geotech Report done • Traffic Impact Study done • EIA Record of Decision completed • Electrical Engineer’s Report done • Civil Engineer’s Report done Conditions of Establishment, Service Agreements and bulk contributions to be agreed and finalised Reports and all other additional relevant information will be provided on inquiry.
Excellent development land in prime location. Adjacent to Bridgefields Estate and up the road from the new Olympus Village Mall. Currently Zoned as agricultural land. Land Area: 1.0083 ha
5HA PRIME VACANT LAND FOR DEVELOPMENT IN THE OLYMPUS AREA This vacant land falls within the zone of various other major developments currently in progress or in the process of being developed in the near future. In addition to this 5ha vacant land there are additional stands stands adjacent to this property which could, as part of the deal be negotiated. The additional land would comprise of various stands of which the one would be 1ha, another one would be 6000 square metres and possibly another land which is owned by the Department of Public Works which can be negotiated. Effectively this would mean that the total land size could cumulatively be as much as 7.6 hectares.
DEVELOPMENT OPPORTUNITY IN OLYMPUS Executive summary: Location: Prime development area just off Atterbury Road. The 2 sites are bordered by proclaimed and developed townships Size: Portion 1= 1.0079 Ha and Portion 2 = 1.1049 Ha (Can be sold separately at R6 950 000 each) Current Zoning: Undetermined (agriculture use) Proposed Zoning: Res 4. Application to Establish a Township has already been submitted, based on the following: Density: 80 units/ha Coverage: 65% Height: 3 x Storey Status: Geotech Report done Traffic Impact Study done EIA Record of Decision completed Electrical Engineers Report done Civil Engineers Report done Conditions of Establishment, Service Agreements and bulk contributions to be agreed and finalised Reports and all other additional relevant information will be provided on inquiry.
Gauteng Pretoria Development opportunity up for sale. Zoning Residential 4 on the ever so popular Atterbury road. Town development plan submitted. The main property can be utilized as a community centre as it is perfectly situated in one corner. The main property host open plan living areas, patio 5 bedrooms with 2 en-suite bathrooms, air-conditioners, build in braai, satellite dish, alarm system, fire-place, guest toilet, 3 covered parking’s, 3 lock up garages, study , art room access control and scullery. SQ. Alarm system connected to armed response. Fitted borehole. This property up for sale in Olympus host top security enclosed by walls, guardhouse and access control. Property is fitted with steel automated roller shutters. 60-80 units for retirement or residential development.
5HA PRIME VACANT LAND FOR DEVELOPMENT IN THE OLYMPUS AREA This vacant land falls within the zone of various other major developments currently in progress or in the process of being developed in the near future. In addition to this 5ha vacant land there are additional stands stands adjacent to this property which could, as part of the deal be negotiated. The additional land would comprise of various stands of which the one would be 1ha, another one would be 6000 square metres and possibly another land which is owned by the Department of Public Works which can be negotiated. Effectively this would mean that the total land size could cumulatively be as much as 7.6 hectares.
DEVELOPMENT OPPORTUNITY IN OLYMPUS Executive summary: Location: Prime development area just off Atterbury Road. The 2 sites are bordered by proclaimed and developed townships Size: Portion 1= 1.0079 Ha and Portion 2 = 1.1049 Ha (Can be sold separately at R6 950 000 each) Current Zoning: Undetermined (agriculture use) Proposed Zoning: Res 4. Application to Establish a Township has already been submitted, based on the following: Density: 80 units/ha Coverage: 65% Height: 3 x Storey Status: • Geotech Report done • Traffic Impact Study done • EIA Record of Decision completed • Electrical Engineer’s Report done • Civil Engineer’s Report done Conditions of Establishment, Service Agreements and bulk contributions to be agreed and finalised Reports and all other additional relevant information will be provided on inquiry.
5HA PRIME VACANT LAND FOR DEVELOPMENT IN THE OLYMPUS AREA This vacant land falls within the zone of various other major developments currently in progress or in the process of being developed in the near future. In addition to this 5ha vacant land there are additional stands stands adjacent to this property which could, as part of the deal be negotiated. The additional land would comprise of various stands of which the one would be 1ha, another one would be 6000 square metres and possibly another land which is owned by the Department of Public Works which can be negotiated. Effectively this would mean that the total land size could cumulatively be as much as 7.6 hectares.
DEVELOPMENT OPPORTUNITY IN OLYMPUS Executive summary: Location: Prime development area just off Atterbury Road. The 2 sites are bordered by proclaimed and developed townships Size: Portion 1= 1.0079 Ha and Portion 2 = 1.1049 Ha (Can be sold separately at R6 950 000 each) Current Zoning: Undetermined (agriculture use) Proposed Zoning: Res 4. Application to Establish a Township has already been submitted, based on the following: Density: 80 units/ha Coverage: 65% Height: 3 x Storey Status: Geotech Report done Traffic Impact Study done EIA Record of Decision completed Electrical Engineers Report done Civil Engineers Report done Conditions of Establishment, Service Agreements and bulk contributions to be agreed and finalised Reports and all other additional relevant information will be provided on inquiry.
5HA PRIME VACANT LAND FOR DEVELOPMENT IN THE OLYMPUS AREA This vacant land falls within the zone of various other major developments currently in progress or in the process of being developed in the near future. In addition to this 5ha vacant land there are additional stands stands adjacent to this property which could, as part of the deal be negotiated. The additional land would comprise of various stands of which the one would be 1ha, another one would be 6000 square metres and possibly another land which is owned by the Department of Public Works which can be negotiated. Effectively this would mean that the total land size could cumulatively be as much as 7.6 hectares.
Excellent development land in prime location. Adjacent to Bridgefields Estate and up the road from the new Olympus Village Mall. Currently Zoned as agricultural land. Land Area: 1.0083 ha
5HA PRIME VACANT LAND FOR DEVELOPMENT IN THE OLYMPUS AREA This vacant land falls within the zone of various other major developments currently in progress or in the process of being developed in the near future. In addition to this 5ha vacant land there are additional stands stands adjacent to this property which could, as part of the deal be negotiated. The additional land would comprise of various stands of which the one would be 1ha, another one would be 6000 square metres and possibly another land which is owned by the Department of Public Works which can be negotiated. Effectively this would mean that the total land size could cumulatively be as much as 7.6 hectares.
DEVELOPMENT OPPORTUNITY IN OLYMPUS, PRETORIA EXCLUSIVE MANDATE GENERAL: PCP (Proof of Compliance Package) Process explanation (Set of Conditions before Promulgation): Once the reports from all departments within the council are received and deemed to be positive, including any tribunal hearing report, the PCP process (2-3 months) can start: 1. Bulk Contributions become payable. As well as any service upgrades if applicable. 2. Once paid and constructed, a certificate is received as confirmation. 3. Proclamation notice is published in Government Gazette. 4. Proclamation (3 weeks after notice is placed). 5. Zoning Certificate is obtained 14 days later. 6. Architect submit final SDP and designs for approval (1-3 months). 7. Construction to start. Objection from Friends of Faerie Glen currently delaying the Approval. Primary aim is to prevent going to a Tribunal. Additional Environmental Consultants (as generally accepted by the Objectors) was appointed on 4 June and the site assessment will be conducted within a week of the appointment date. The Environmental Report is then expected within 10 days thereafter. The Town Planner will then approach the Objectors with the additional Environmental Report to sway the Objectors to withdraw their objection. The Approval Letter will follow as soon as the objection is withdrawn. PCP process can then start. Tribunal date to be set if unsuccessful with the above mentioned. PROJECT SUMMARY: 25 Units @ 194m / unit (3 bed, 2.5 bathroom, open plan, double garage). Sectional title. Total unit squares: 4850m. Individual stand size: 284m Stand size: 10,000m.
Excellent development land in prime location. Adjacent to Bridgefields Estate and up the road from the new Olympus Village Mall. Currently Zoned as agricultural land. Land Area: 1.0083 ha
DEVELOPMENT OPPORTUNITY IN OLYMPUS Executive summary: Location: Prime development area just off Atterbury Road. The 2 sites are bordered by proclaimed and developed townships Size: Portion 1= 1.0079 Ha and Portion 2 = 1.1049 Ha (Can be sold separately at R6 950 000 each) Current Zoning: Undetermined (agriculture use) Proposed Zoning: Res 4. Application to Establish a Township has already been submitted, based on the following: Density: 80 units/ha Coverage: 65% Height: 3 x Storey Status: Geotech Report done Traffic Impact Study done EIA Record of Decision completed Electrical Engineers Report done Civil Engineers Report done Conditions of Establishment, Service Agreements and bulk contributions to be agreed and finalised Reports and all other additional relevant information will be provided on inquiry.
DEVELOPMENT OPPORTUNITY IN OLYMPUS, PRETORIA EXCLUSIVE MANDATE GENERAL: PCP (Proof of Compliance Package) Process explanation (Set of Conditions before Promulgation): Once the reports from all departments within the council are received and deemed to be “positive”, including any tribunal hearing report, the PCP process (2-3 months) can start: 1. Bulk Contributions become payable. As well as any service upgrades if applicable. 2. Once paid and constructed, a certificate is received as confirmation. 3. Proclamation notice is published in Government Gazette. 4. Proclamation (3 weeks after notice is placed). 5. Zoning Certificate is obtained 14 days later. 6. Architect submit final SDP and designs for approval (1-3 months). 7. Construction to start. • Objection from Friends of Faerie Glen currently delaying the Approval. • Primary aim is to prevent going to a Tribunal. Additional Environmental Consultants (as generally accepted by the Objectors) was appointed on 4 June and the site assessment will be conducted within a week of the appointment date. The Environmental Report is then expected within 10 days thereafter. • The Town Planner will then approach the Objectors with the additional Environmental Report to sway the Objectors to withdraw their objection. • The Approval Letter will follow as soon as the objection is withdrawn. • PCP process can then start. • Tribunal date to be set if unsuccessful with the above mentioned. PROJECT SUMMARY: • 25 Units @ ± 194m² / unit (3 bed, 2.5 bathroom, open plan, double garage). Sectional title. • Total unit squares: 4850m². • Individual stand size: ± 284m² • Stand size: 10,000m².